Everything is looking good. The stone is all up and the concrete done. The outside is basically finished except for paint on the garage doors (dark brown) and final grading and clean up. The interior is in good shape as well again needing cleanup an some touch up and finally the carpet.
Tuesday, February 12, 2008
Just about done
Everything is looking good. The stone is all up and the concrete done. The outside is basically finished except for paint on the garage doors (dark brown) and final grading and clean up. The interior is in good shape as well again needing cleanup an some touch up and finally the carpet.
Saturday, January 26, 2008
One step closer
The final coat of stucco is on the outside of the house although they still need to add stone to the front. Also if you look close you will notice that there are blankets on the ground. They are thawing the ground to pour the driveway so the next pictures will show it (the driveway)!
The kitchen is almost done. Cabinets are in the countertop is done and the backsplash just needs grout. The wood floor needs to be finished and the electric and plumbing finished and it's all set.

The kitchen is almost done. Cabinets are in the countertop is done and the backsplash just needs grout. The wood floor needs to be finished and the electric and plumbing finished and it's all set.
Saturday, January 12, 2008
Stucco and Flooring
Contractors have been busy even through the holidays. The drywall is done, textured and painted. The wood floor is down but needs stained and the tile floors are started. On the outside they have the first coat or scratch coat of the stucco done. They will put one more coat on which will have the color but need to wait for a little warmer weather.